From the city’s published source · Checked Oct 21, 2026
This page brings the published information into this portal. For the complete original layout, attachments or later updates, open the official source.
Open original sourceRead the original PDF layout here
The original document opens below when this panel is expanded. You can also use the document button above.
Read searchable source text: requirements, steps and published details
This transcription supports reading and search. Use the original PDF for table-column alignment, signatures, symbols and footnotes.
Published requirements checklist.
PDF page 1
CBRDGTC Form 8
Republic of the Philippines
City of General Trias
Province of Cavite
CITY BUILDING REGULATORY DIVISION
M-F 8 am to 5 pm | Contact # 0960-216-1997 | obo@generaltrias.gov.ph
GROUND FLOOR EXTENSION PERMIT
APPLICATION REQUIREMENTS
For Roof Extension with or without fence: 2 Copies each document
For Fencing ONLY with existing structure: 1 Copy each document
☐ Certificate of Occupancy
☐ Lot Plan
- duly prepared, signed and sealed by a LICENSED GEODETIC ENGINEER.
☐ Proof of Ownership
o Photocopy of the Transfer Certificate of Title/ Certified True Copy of Transfer Certificate of Title
o In case the lot is not under the name of the applicant/owner, additional requirement:
▪ Submit copy of either:
• Notarized Deed of Absolute Sale
• Notarized Contract of Sale
☐ Updated Tax Declaration (Land and Building)
☐ Drawing Plans – signed by the OWNER. (A3 Size Paper or as required by the Developer)
IMPORTANT NOTE:
Observe requirements and restrictions of National Building Code of the Philippines on
Drawing Plans.
Ground Floor Extension includes kitchen, bathroom and garage extension only.
o In case the location of the construction is inside the subdivision:
▪ HOA / Developer’s Approval on Plans
o For PROFRIENDS/LANCASTER APPLICANTS:
▪ Plans must be signed and sealed by a LICENSED CIVIL ENGINEER/ARCHITECT
▪ Attach copy of Updated Professional Tax Receipt & PRC License of LICENSED CIVIL
ENGINEER/ARCHITECT
- To be sealed and with three (3) signatures.
Clearances
☐ Barangay Clearance for Construction Permit
☐ If located inside a subdivision:
o HOA / Developers Clearance for Construction Permit
NOTE:
➢ For representatives, submit 1 Original Copy and 1 Photocopy of NOTARIZED Authorization Letter or Special
Power of Attorney stating the specific task of the representative/authorized person (to sign, to process, etc.) in
Ground Floor and/or Fencing Permit Application.
➢ Attach a copy of Valid ID with three (3) signatures of both Owner and Authorized Person/Representative
Form editions and office-hour statements are retained as originally printed. Check current city notices and the responsible office for later changes.